Sudbury River Conduit, B.W.W., div. 4, sec. 15, Sept. 13, 1876. View showing interior structure of Charles River Bridge over arches "F" & "G".
|
Sudbury River Conduit, B.W.W., div. 4, sec. 15, Sept. 13, 1876. Vie of centring of arch "A" (when almost completed) from east bank of river and looking down stream.
|
Sudbury River Conduit, B.W.W. Div.4, Sec 15, Sept. 13 1876, view of cutting of large arch taken from east bank of Charles River.
|
Water works, Newton, Mass.
|
Sudbury River Conduit, B.W.W., div. 4, sec. 15, Sept. 13, 1876. View of centring of arch "A" taken from Ellis St. and looking north.
|
Sudbury River Conduit B.W.W., Div. 4 Engineers and inspector, Sept. 13, 1876.
|
Sudbury River Conduit B.W.W., Div. 4 Engineering party, Sept. 13, 1876.
|
B.W.W. dam division, Dam I, gate house and overflow from north side of river, Oct. 1, 1877.
|
B.W.W. Dam Division. Dam III, south centre wall and 8" permanent sheeting looking north, June 14, 1877.
|
B.W.W. dam division, Dam III, temporary sheeting for north center wall, looking north, July 14, 1877.
|
Sudbury River Conduit, B.W.W. div. 4, sec 15, Aug. 17 1876, arches E & F, Charles River bridge.
|
B.W.W. Dam Division, Dam III, North Center wall and grading looking south.
|
Water works, Newton, Mass.
|
Sudbury River Conduit, B.W.W. div. 4, sec 15, Aug. 17 1876, lower part of centering of great arch.
|
B.W.W. div. 1, sec A, Winter Street bridges and conduit below Dam I, and excavation for river wall, July 14, 1877.
|
Water works, Newton, Mass.
|
Sudbury River Conduit, B.W.W. div.4, sec 15, Aug. 17 1876, north side of arch "G", Ellis St.
|
B.W.W. dam division, Dam I, gate house foundation and south embankment wall, July 14, 1877.
|
Sudbury River Conduit, B.W.W. div.4, sec 15, Aug. 17 1876, view of Charles River bridges taken from Newton side and looking west.
|
B.W.W. dam division, Dam I, center wall and embankment, north side of river, July 14, 1877.
|
Sudbury River Conduit, B.W.W. div.4, sec 15, Aug. 17 1876, ledge cut.
|
Sudbury River Conduit, B.W.W. div.4, sec 15, ledge of cut, Aug. 17 1876.
|
Water works, Newton, Mass.
|
Sudbury River Conduit, B.W.W. div.4, sec 15, Aug. 17 1876, view of Charles River bridges taken from Needham side, looking east.
|
B.W.W. dam division, Dam II, temporary sheeting fro outer wall, north side of gate house, July 14th, 1877.
|
B.W.W. dam division, Dam II, foundation for gate house and overflow, 1877.
|
B.W.W. dam division, view showing excavation for gate house foundation and foundation wall of overflow at Dam II, Junly 14, 1877.
|
Water works, Newton, Mass.
|
Sudbury River Conduit, B.W.W. div.4, sec 15, May 13 1876, view from Newton side and looking west.
|
Water works, Newton, Mass.
|